Dear Warwick residents
The Back Garden will remain closed through next week for the continuation of FISP repairs. Amsterdam is continuing work in the back and on the west side of 35th Ave. Work is weather dependent. The garden closure includes all times, day/night/weekend and "passing through" from the back entrance or exiting through the basement. The only exception is management pre-approved moves, deliveries or contractors. If you are on drops 4/5/6 (D/E lines) drop 11 (J line) keep your windows closed and locked with blinds closed for privacy while work in progress Monday-Friday 8am-5pm. Make sure no fragile items are near your outside wall. Work will also commence on the east side hallways. Bubbling paint, damp walls, stains, etc. and report to Orlando 646-209-8530 as soon as possible. Thanks to you we are able to capture areas for inspection and repairs. Warwick Board of Directors New Bedford Management Dear Warwick residents
The Back Garden will remain closed through next week for the continuation of FISP repairs. Amsterdam is wrapping up work in the back and starting work on the west side of 35th Ave. Work is weather dependent. The garden closure includes all times, day/night/weekend and "passing through" from the back entrance or exiting through the basement. The only exception is management pre-approved moves, deliveries or contractors. If you are on drop 4 (E line) drop 6 (D/E lines) drop 9 (A line) drop 11 (J line) keep your windows closed and locked with blinds closed for privacy while work in progress Monday-Friday 8am-5pm. Make sure no fragile items are near your outside wall. Spray bar water test will be conducted on Monday, November 9 starting at 9:30a.m: "A" line drop 9 from 6th floor "J" line drop 11 from 4th floor Keep windows closed and locked Bubbling paint, damp walls, stains, etc. and report to Orlando 646-209-8530 as soon as possible. Thanks to you we are able to capture areas for inspection and repairs. Warwick Board of Directors New Bedford Management Dear Warwick residents
Please remember clocks "fall back" as daylight savings time ended early this morning. The Back Garden will remain closed through next week for the continuation of FISP repairs. Amsterdam is wrapping up work in the back and starting work on the west side of 35th Ave. Work is weather dependent. The garden closure includes all times, day/night/weekend and "passing through" from the back entrance or exiting through the basement. The only exception is management pre-approved moves, deliveries or contractors. If you are on drop 4 (E line) drop 6 (D/E lines) drop 9 (A line) drop 11 (J line) keep your windows closed and locked with blinds closed for privacy while work in progress Monday-Friday 8am-5pm. Make sure no fragile items are near your outside wall. With recent rain storms we continue to remind residents to check for leaks - bubbling paint, damp walls, stains, etc. and report to Orlando 646-209-8530 as soon as possible. Thanks to you we are able to capture areas for inspection and repairs. Warwick Board of Directors New Bedford Management Dear Warwick residents
The Back Garden will remain closed through next week for all of our safety for the continuation of FISP repairs. The garden closure includes all times, day/night/weekend and "passing through" from the back entrance or exiting through the basement. The only exception is management pre-approved moves or deliveries. If you are on the J, K, L, G, O, A lines keep your windows closed and locked with blinds closed for privacy while work in progress Monday-Friday 8am-5pm. Make sure no fragile items are near your outside wall. Tomorrow, Monday October 26, starting at 10am Amsterdam will be conducting spray bar tests on the "A" line drop #9 and the bulkhead on the east side affecting the "M" line. Please make sure your windows are closed and locked. With recent rain storms we continue to remind residents to check for leaks - bubbling paint, damp walls, stains, etc. and report to Orlando 646-209-8530 as soon as possible. Thanks to you we are able to capture areas for inspection and repairs. Warwick Board of Directors New Bedford Management Dear Warwick residents
|
Archives
October 2021
Categories |